duncan1_9_8_4
UK Railway Signaller and Garden Railway Operator


Busy morning. Started by cleaning the track, and fettling the point work.
Then I ran a electrical cable out from the track power supply, right down the side of the house, to feed it in to the rails, at what is effectively the end of a very long siding. So now it's a circle, electricity wise, meaning no power drain towards the end, especially as there is point work in said siding. Just a bit of tidying up later with some postcrete to hide the wire. Also, I have re done the level crossing, that had to be removed with the remodeling work a few weeks ago.




















Then I ran a electrical cable out from the track power supply, right down the side of the house, to feed it in to the rails, at what is effectively the end of a very long siding. So now it's a circle, electricity wise, meaning no power drain towards the end, especially as there is point work in said siding. Just a bit of tidying up later with some postcrete to hide the wire. Also, I have re done the level crossing, that had to be removed with the remodeling work a few weeks ago.



















