Looks like a chequered flag moment. The warm weather has done it's bit and the glue has probably set as hard as it's going to. This is not meant to be a review, more an observation of what can be expected. I'll leave the comments, suggestions and critical eye in the capable hands of the recipient when he's had a chance to put it to the test. I have no intention of attempting any more conversions so the thread will become the 'go to' for advice, instruction. pitfalls and shortcomings for those who fancy having a bash.
I set up a double track scenario today with an oval of R1 to try and show the limitations.
Test rolling stock was:
Inner loop - LGB Casey and ToyTrain wagons.
Outer loop - LGB Otto type plus ToyTrain coach and wagon and a Starter Set type coach.
I left the trains to run in opposite directions for 15 minutes to ensure just about every track positioning has been covered. There were no collisions or conflicts and I considered the clearances seen to be acceptable.
1: This custom radius stuff is really only suitable for SWB locos and stock to the 'ToyTrain' dimensions.
2: It might handle something like the bogie US Starter Set coaches, but I have none to test with.
3: I used a Casey as I thought this might be closer to the Chloe chassis. The rear overhang and outswing of the coupler loop was pretty close to the maximum the following stock could handle.
4: Fitting some sort of swivelling coupler on the loco might be an option, but I think most of the LGB hook and loop offerings are rigid.
5: it will function as double track, but the outer line will need to run stock
no longer than a 4 wheel Starter Set coach or wagon.
6: By it's very nature, due to the original rigid framework being compromised, it will remain somewhat fragile and needs to be handled with care especially when being assembled and taken apart.
7: I would suggest it is always used 'fully supported' on a flat surface and not balanced on track piers or trestles.
There are a few photos and a short video clip below.
Please feel free to add comments or suggestions to this thread. A 'proper' one will be created in the track section after assessment has been completed.
View attachment 288490View attachment 288491View attachment 288492