The lifting bridge section is under way. The 2020 ali profile (a-la 3D printer frame type stuff) seems great. Incredibly stiff and light. I'm waiting on hinges and a few more 90deg brackets to finish that off.
More track and boards have gone down to complete the run to the bridge.
In the meantime some light relief was provided by spraying and installing a crane to help load Thomas's trucks. The little Fat Controller gives it the once-over and a commissioning test

More track and boards have gone down to complete the run to the bridge.
In the meantime some light relief was provided by spraying and installing a crane to help load Thomas's trucks. The little Fat Controller gives it the once-over and a commissioning test