nico
Registered
As the sun warmed up the day i decided it was time to start this project .so heres some pictures of the work so far
i decided this would be the new section
with one of my new aristocraft switches from the dragon i set to work cutting out a section of track
and the switch in place
one lenght of track in
Work has been stopped at the moment as i negotiate with the on site engineer who dosnt recall a conversation last year concerning the track running through flower bed&:
negotiations have started again8|
so to take my mind off i put my windmill in place its spinning like mad with all the hot air at the moment
i decided this would be the new section

with one of my new aristocraft switches from the dragon i set to work cutting out a section of track




and the switch in place

one lenght of track in

Work has been stopped at the moment as i negotiate with the on site engineer who dosnt recall a conversation last year concerning the track running through flower bed&:
negotiations have started again8|


so to take my mind off i put my windmill in place its spinning like mad with all the hot air at the moment


