Eighton Bahn AKA testing testing RhB

Yesterday, tried a longish freight, so much so that the only loop it would fully fit in was the Dead Ctr Horseshoe loop, causing pathing problems for the operating department...

P1040443.JPG20250501_142310[1].jpg

There was also a problem of the Navigators and the reciever not talking to each other for a while, causing all sorts or problems, but it was sorted so the final passenger train of the night could run...

20250501_214132[1].jpg20250501_214223[1].jpg

...I bet you the station staff were all locked up and out the door, befor the train had cleared the bridge.
 
Last edited:
Back
Top Bottom