Nodrog1826
Professional Idiot
Yesterday, tried a longish freight, so much so that the only loop it would fully fit in was the Dead Ctr Horseshoe loop, causing pathing problems for the operating department...

![20250501_142310[1].jpg 20250501_142310[1].jpg](https://cdn.gscalecentral.net/2025/05/thumb/538705_20250501_1423101.jpg)
There was also a problem of the Navigators and the reciever not talking to each other for a while, causing all sorts or problems, but it was sorted so the final passenger train of the night could run...
![20250501_214132[1].jpg 20250501_214132[1].jpg](https://cdn.gscalecentral.net/2025/05/thumb/538708_20250501_2141321.jpg)
![20250501_214223[1].jpg 20250501_214223[1].jpg](https://cdn.gscalecentral.net/2025/05/thumb/538709_20250501_2142231.jpg)
...I bet you the station staff were all locked up and out the door, befor the train had cleared the bridge.
There was also a problem of the Navigators and the reciever not talking to each other for a while, causing all sorts or problems, but it was sorted so the final passenger train of the night could run...
...I bet you the station staff were all locked up and out the door, befor the train had cleared the bridge.
Last edited: