What happened at your workbench today?

...and whilst we are on the subject of railcars, a package turned up today with drill bits and a 6BA tap which should be enough to produce a rolling chassis.
Firstly, the wheel centres were opened out to ⅛", and the crankpin bosses were drilled and tapped with a 6BA thread. Unfortunately one hole drifted southwest despite having been centre-punched accurately-see bottom right.
20260924_161623.jpgI always said that I'd take the machining of the wheels as far as I could before I ran out of equipment, or skill. This might be that point!
Anyhow, that means I have nothing to lose on the properly technical bit, creating square holes in the centre of the wheels. They need to be accurate, identical, and worked to a close tolerance.
All I have is a square needle file...20260924_164816.jpg
I'm quite pleased with the results, but will they be accurate enough?
20260924_170012.jpg
There's only one way to find out: assemble the power bogie.
20260924_172444.jpg
Which  looks the part, but I can't find the tiny allen key that fits the retaining screws in the centre of the wheels. In all honesty I think they'll bind, as they do with the wheels slightly loose, but that's a problem for another day. But it's always good to leave the workshop on a high, so a quick trial fit is in order...
20260924_174851.jpg
 
80 holes later, drilled to locate the seats, which have also been undercoated, we have a more accommodating interior.
20260925_115407.jpg20260925_151529.jpg20260925_152252.jpg20260925_152432.jpg
This improving the original or putting off starting the other.......
 
I had a two steps forward, one step back day in the workshop, looking to sort out the motion on the railcar build. In brief, it was binding badly, and no wonder the chassis has a twist on it, which means the axles are skew and the wheelbase is noticeably (1+mm) longer on one side than t'other. It was made using some rather thin brass that I had kicking about, so this time I will buy the right material (probably ⅛" steel) and start again. But no experience is ever wasted, and I've learned a lot along the way.
 
Sunday and yesterday saw the completion of the seats in railcar 20 and internal painting, it was quite ironic that most people I know suffer from the windows coming unstuck in their railcars, mine where stuck and took some removing without breaking!!
20260928_161958.jpg20260929_092728.jpg
And a couple of night photos
20260928_221051.jpg20260928_221203.jpg
Now I need to replace the glazing!
 
Parts arrived for a future project

I obtained a mallet body of eBay and managed to source a chassis today,

My plan is a mini mallet, using stainz motor blocks, are these are considerably easier and cheaper to obtain

The body can’t sit flush as the pivots are in the wrong place.

Dan

View attachment 361613View attachment 361614
Oh one pic mallett the other meyer. Sure there will be a way to adapt, perhaps with a new ally flat to mount the bogies on?
 
Whilst the windows have been glued in around work and other things going on, I've now started to work out the rear couplings, which like the Accucraft bogie coaches, comes off the bogie fastened to a clunky piece of steel, so plan A was to replicate the original coming through a slot in the bodywork, which is too high, not a problem as the railcars will just couple to each other, but at this point to make things easier, I'm going to mount it lower with no need to butcher the bodywork until I get it right when I'm building the other car, anyway a few pondering photos!20261004_104247.jpg
Working out how much swing is needed on the tightest curve.
20261004_153727.jpg
Coupling high to potential mounting point.
20261004_104307.jpg
 
Living in a parallel (IOM) universe to @Fezwig, I too have been pondering couplings. I drew up the saloons this morning, ready for Peveril to take her much-delayed train out, and took a couple of photographs to prove that it happened.
20261004_121534.jpg
When I built the saloons I copied the Accucraft arrangement of mounting the couplings on a drawbar which was in turn fixed to a bogie. It allows the coaches to run on 4ft-radius curves (or less?), with the payoff being an unprototypical gap between the coaches, which are all too visible in the photo above.
Initially, I fitted the couplings onto the bufferbeams, but my line had some 4ft curves at the time and derailments occurred, hence the drawbars. But the extensive re-laying that has taken place over the past 15 months has transformed the line, with trains running without derailments being the norm. Yesterday I ran an IOM might-have-been, a 'pairs' coach chassis fitted with one coach body and a wagon body; it has always been temperamental, but ran perfectly.
So it was the test mule for body-mounted couplings this afternoon, and again ran without problems. The obvious next step was to revert to body-mounted couplings on a saloon coach to see if that would work -and it did!
20261004_174545.jpg20261004_174555.jpg
The plan is to remove the drawbar couplings from all the saloons, and possibly the Accucraft pairs coaches too in due course. While I'm using standard Accucraft chopper couplings the gaps between rolling stock will never be as close as the real railway, but it's a step in the right direction...
20261004_174538.jpg
Nº5 stands on the goods dock road with the adapted stock.
 
Living in a parallel (IOM) universe to @Fezwig, I too have been pondering couplings. I drew up the saloons this morning, ready for Peveril to take her much-delayed train out, and took a couple of photographs to prove that it happened.
View attachment 361777
When I built the saloons I copied the Accucraft arrangement of mounting the couplings on a drawbar which was in turn fixed to a bogie. It allows the coaches to run on 4ft-radius curves (or less?), with the payoff being an unprototypical gap between the coaches, which are all too visible in the photo above.
Initially, I fitted the couplings onto the bufferbeams, but my line had some 4ft curves at the time and derailments occurred, hence the drawbars. But the extensive re-laying that has taken place over the past 15 months has transformed the line, with trains running without derailments being the norm. Yesterday I ran an IOM might-have-been, a 'pairs' coach chassis fitted with one coach body and a wagon body; it has always been temperamental, but ran perfectly.
So it was the test mule for body-mounted couplings this afternoon, and again ran without problems. The obvious next step was to revert to body-mounted couplings on a saloon coach to see if that would work -and it did!
View attachment 361779View attachment 361780
The plan is to remove the drawbar couplings from all the saloons, and possibly the Accucraft pairs coaches too in due course. While I'm using standard Accucraft chopper couplings the gaps between rolling stock will never be as close as the real railway, but it's a step in the right direction...
View attachment 361778
Nº5 stands on the goods dock road with the adapted stock.
Some great photos there, thanks for sharing.
 
A prototype coupling has been tried, using a bit of an old Accucraft coupling bar, drilled and screwed to the under floor supports, with a 10 ba bolt through it to provide a pivot for the coupling.20261005_123511.jpg
20261005_124144.jpg
20261005_122916.jpg
Whilst it was the right height, the body would not sit fully in place and it is a bit short by about 10mm
20261005_122911.jpg
So by moving it below the mounting point with an 8 ba nut as a spacer the body sit in it's rightful place.20261005_171102.jpg20261005_124922.jpg
So next will be to extend the coupling and perhaps move the pivot further back, height wise, I'll keep it as it is until I can test it with the other railcar when built, the prototype couplings were higher than IMR couplings which caused no end of problems, this would need a slot cutting in the rear body panel, we shall see :think:
 
Brevior Vita Est Quam Pro Futumendibus Negotiam Agendo...

Jon.

(I don't know if this is actually correct, but it was used as a business motto by an old acquaintance!)
 
Latin?

It's all Greek to me!

Something I never studied, being from a comprehesive school....
 
Back
Top Bottom