What happened at your workbench today?

Busy with bits of 2 jobs today, first off the railcar roof, cut and drilled 4 plates to locate in the top of the doorways with a screw in each.
View attachment 363274View attachment 363275View attachment 363276View attachment 363277
Secondly, the replacement dome arrived, so a quick clean up and a trial fit,
View attachment 363278View attachment 363279
My Cale has 2 humps :smirk:
Needs a bit of fine tuning and a new method of securing.

Busy with bits of 2 jobs today, first off the railcar roof, cut and drilled 4 plates to locate in the top of the doorways with a screw in each.
View attachment 363274View attachment 363275View attachment 363276View attachment 363277
Secondly, the replacement dome arrived, so a quick clean up and a trial fit,
View attachment 363278View attachment 363279
My Cale has 2 humps :smirk:
Needs a bit of fine tuning and a new method of securing.
Hi Pete silly question if it goes over the old dome ? What about a drop of silicon sealant to attach it ?
 
Was thinking about your rad last night and a very inivitive job it is, had you pre tinned the U section lightly on the base of the u section it may have made a neater job in the end. I say this not to upset you but perhaps help others that may wish copy the idea. I have certainly bunged it into the ‘if I need a rad’ single brain cell.
Nobody is ever going to investigate it as close up as that photo :shake:
 
Hi Pete silly question if it goes over the old dome ? What about a drop of silicon sealant to attach it ?
No John, the small one is a tad to big!! there is a hole in the top, so I'm thinking of using some brass tube screwed through (like the original) the boiler barrel, plus it needs to be moved back towards the cab a few mill.
 
Back
Top Bottom