The Big Bogie Build is underway! As ever, I'm over-engineering things, using 3mm mild steel strip. After cutting and filing, the ends were drilled and tapped to 8BA -the next few stages will be done to the sides as a pair, ensuring that they are as close as possible to identical.

The key thing is that the axle hole spacing (i.e. the bogie wheelbase) is identical to that of the coupling rods, so having checked that
they are identical (they are!), one of them gets used as a jig to drill the chassis:

Bingo!

The strip is 38mm deep, but most of it only needs to be 25mm. Not having a milling machine (Dear Santa...), I'll have to do this the old-fashioned way: chain drill it, connect the holes with a hacksaw/abrafile and then file everything to size...

No, that swarf isn't a 'serving suggestion', it just goes everywhere: and yes, safety goggles were worn! A good point at which to stop for the day...