The Woodlock Line

Super job, rest of track en route this morning other than that which was already in stock. Looking forward to a visit at some stage this year hopefully.
Always welcome mate, and thanks very much, you've saved me a fortune in track costs, if you think what it would have all cost brand new! I'm very grateful.
 
Phase 1b now complete. Other than removing the shuttering and making a grass embankment. Today is one of these days where you had an idea in your head, but the results are better than how you imagined it. Now waiting on track clamps and curves, then away we go again. That will be a lonnnnnnng day.

PXL_20260421_102209814.jpgPXL_20260421_104645468.jpgPXL_20260421_104647781.jpgPXL_20260421_104801980.jpgPXL_20260421_105056414.jpgPXL_20260421_105309750.jpgPXL_20260421_110703787.jpgPXL_20260421_111433605.jpgPXL_20260421_111446991.jpgPXL_20260421_112029809.jpgPXL_20260421_112910353.jpgPXL_20260421_114000558.jpgPXL_20260421_115715400.jpgPXL_20260421_115720611.jpgPXL_20260421_115726413.jpgPXL_20260421_115729955.jpgPXL_20260421_120155914.jpgPXL_20260421_121920427.jpgPXL_20260421_122119029.jpgPXL_20260421_122206389.jpg
 
Excellent work and fast too ! This is in no way a criticism, simply an observation, that applies to us all. Would you have taken the amount of photos that you took in the days of film cameras ?.....:giggle:
 
Looking great. Its always nice when expansion does not require reconfiguration to existing track layout and you can work independently and still run trains!
 
Now the technical bit at the path,
CCTV, AHB, UWC, Red/Green or plain old open crossing?
Not sure the Amazon driver will have the time to phone York Signalling Centre :giggle:
 
Back
Top Bottom