The Woodlock Line

A slight delay to the installation of new platforms, as the roof felt I use, is too brittle to cut in the current chilly temperatures. Also a delay to my building getting installed as UPS has just said it's delayed, after waiting in all afternoon. Joy.
 
Is that the drain from a condensing boiler? If so, it might need a defrost and lagging...
It's from where the exhaust, is that the right word? comes out of the wall up near the roof, it's been dripping down onto the frozen ballast. It also hits the condensation pipes from the Aircon, resulting in the stalactites.
 
Back
Top Bottom