Overhead wires are my first choice because above all I like electric locomotives. Until a few years ago, I still had catenary wires strung over a portion of my railway. But my railway, being at ground level, is also a garden. The maintenance just got to be too much for me to handle. And it was proving to be an issue with the head gardener, not to mention grandchildren.
 
The track maintenance gang has been out today carrying out remedial work as required prior to resumption of full services.
Whilst there are areas that still require attention clearance was given for the railways new passenger train to venture toward Milburn in the name of route clearance.
764dcb92e759400eb0acae854348b79c.jpg

1501a5450fb9464482e8cd5bb5d000de.jpg

It is pictured here just South of Milburn
f25a4e42cb644be8b53345b2b56b7597.jpg

And on it's return to Chad Valley via The Easton Bank
 
With most of the railways steam fleet still undergoing winter repair/maintenance work the Directors 'pet' loco Elise was steamed to assist in some drainage works.
acd6cba8d063451bbe36a1f227773ce1.jpg

da2b73cd7e5746fabc67491cf17edae4.jpg
 
Promised investment in the line continues with some additional coaching stock arriving. A post van will run as required with this rake when it enters full service.
The test train crosses Chad Valley viaduct
3cf40dcc0f994ec296e6efbda4ba7f56.jpg

Is then seen on the Northerly approach to Uber Junction
fbf217c77be840e4bde4053aa7e56bfb.jpg

And finally descending towards the Easton bank
aa55f5e868b7461c87e20818ce8ad290.jpg

The final picture highlighting the gradients encountered in various locations on the line
 
A slight increase in outside temperature enabled allowed for testing of the recently acquired loco "Stretton"
Pictured here waiting while the lines engineers carry out the final assessment of the forthcoming works.
a2767fb2b967418fbcc2792a2cc19162.jpg

And departing with initial tests complete
35b73bd8eba94a2b864158fd7c75de92.jpg
 
It's lawn edging,I was going to paint it but I didn't get around to it. The bridge is getting a new deck over the next few weeks hopefully so I'll paint it then weather permitting!
 
The bank holiday weekend should see the start of works at Quay station and the oil terminal which will allow for more flexible operation.
An overview of the current layout
7550ed60e4ae4a1d8ebea632717b7ba0.jpg

And the current entry to the oil terminal
d26a056da777473f8a7c283e59603e32.jpg
 
With the bridge stripped back to just a deck some track laying was carried to confirm fit etc before the new deck is cut and fitted.
The new Oil Terminal layout
de4442f4a317476abbf262b0688e64d4.jpg

Entry to Quay from the waterfall side including a new siding for a banking engine
67589f08bfeb49d9aedfa3bf67102dbe.jpg

And finally an overview of the pond area
261646c5cf1348799fbe6233369700e5.jpg
 