The spring addition (digital; mauve colors) will be added to last summer's job (roughly 12ft square layout; see '
Ramosch' built below a deck; analog).
The new run (about 160ft or 48m) includes a loop under the deck (below 'Ramosch') follows the house wall to swing around a corner to a former firewood storage area to 'Aschera' station. The new station at this time is a simple 3-way switch affaire and positioned above another turn loop of the new run.
Analog and digital layouts have no electric nor track connection (I want to be very sure not to cause electrical mayhem). The visual intersection is to be a shortened version of the
Trisanna bridge (oblong blue box in diagram) at Schloss Wiesberg, Tyrol. Very interesting Trisanna engineering materials
here.
While the mighty bridge is from the normal gauge Arlberg railway, my rolling stock models narrow gauge ('Ramosch' with Zillertalbahn items, 'Aschera' with RhB ones). The wide curves are to be supported by pillars 3ft to 4ft high and of a variety of constructions. The taller ones nearer to the house wall, the shorter ones integrating also some hanging plants (sm arrows indicate descent around 2.5%).