Well at last we had a break in the weather that coincided with myself being home to get some pictures. The railway is going through some major changes at the moment, so please excuse the current building site appearance.
The boxcar has been put to use with the newly formed PW train, testing clearances and the new level crossing.
At Egham Hill station, loading up with measuring equipment and other useful (but invisible) tools,
Passing the new crossing, this was the first train to test the operation of the automatic crossing which proved a success, although the warning lights are not quite bright enough,
Testing clearances on the new reversing loop,
Then on and up to the hill bridge. A little tight here with the new tipper wagons,
but with a careful check from the local Rail Inspector the all clear was given,
On the 20th we will be heading to the Exmouth/Devon Cliffs area, if anyone in the area would like me to pass it on personally then please PM me so we can make arrangements. If I have not heard anything by Monday 16th then I will post onto the next person on the list.
Tim