Re:Work on The Waterloo Creek Railway starts.
Well things have moved on a lot since my last post and the railway now forms a complete loop, at last.
I did run a small test train this morning and all was ok apart from the normal list of tweaks and leveling now needed along with a lot more ballasting. I may now play for a while before doing much more though.
The next few pictues show all the path crossings now in place and thankfully working ok.
Jason.
Well things have moved on a lot since my last post and the railway now forms a complete loop, at last.
I did run a small test train this morning and all was ok apart from the normal list of tweaks and leveling now needed along with a lot more ballasting. I may now play for a while before doing much more though.
The next few pictues show all the path crossings now in place and thankfully working ok.



Jason.