The LESEN GROSSEN BALLEUPPEN Railway

Whoever was "noughts" in the game of noughts and crosses weren't very good were they?:D
 
flyingsignalman said:
Whoever was "noughts" in the game of noughts and crosses weren't very good were they?:D

Ah Keith, if I had put a hand or foot on any of the crosses then there would a blooming great nought (hole) there which would mean game over, start again. :laugh:
 
MONDAY 12th APRIL 2010
THE SUNSHINE CONTINUES TO CONTINUE AS DOES THE WORK ON THE EXTENTION
b5bd4c3061e6415089c0164e46a1613c.jpg
8eb3f7be7a4c4fb0bfdd8e7fd373307c.jpg
be78a4096ca242cab4160a8d5e047c33.jpg
The Track is only laid in place at the moment, it will be gauged as it is fixed down.
 
It's looking good - very neatly done.

What are the tops made from?
 
flyingsignalman said:
It's looking good - very neatly done.

What are the tops made from?

Hi Keith, Thanks for your comments, see post 21 above which explains the construction.
I hope this answers your question, always happy to answer more if I can.
cheers for now, Trevor.
 
TUESDAY 13th APRIL
Laid out the track, today, to see if it fits and that I had enough.
Well it sort of fits and I sort of have enough track (For Now).
775620539e9f463391ea613241bfa885.jpg
I know it does not look like the plan at the start of this thread,
but a plan is only a plan and its not always like it was on the A team.
I think I might be able to fit a forth station in.
There are thoughts to have an upper level single line Tram Shuttle,
So no I don't have enough track (yet).
 
Looking really good Trevor, carn't wait to see the finished artical
 
Nemo said:
Looking really good Trevor, carn't wait to see the finished artical

Thanks Steve, nor can I, but is a Railway ever finished. :bigsmile:
 
Interesting plan Trevor; looks like you have added a reversing chord too....
 
Gizzy said:
Interesting plan Trevor; looks like you have added a reversing chord too....

Without the Reversing Chord the cat flap would be one way traffic only. :bigsmile::bigsmile::bigsmile:
 
[align=center]A REVISED TRACK PLAN[/align] [align=center] [/align] [align=center]
5d39062b080048f298154ca66156d7f3.jpg
[/align] [align=center] [/align]
 
WEDNESDAY, THURSDAY & FRIDAY - 14th, 15th & 16th APRIL 2010
The Work Gang have been busy laying track.
e119317b66a5426585fca4b58ebb5846.jpg
They arrived Tuesday Morning
ecefd78878ba43478f92c9117ef4edc8.jpg
Worked very hard
55b9d179b6534efe94cccc522210fab8.jpg
They left early on Friday because they are going to be working all through the weekend.
 
Round n Round said:
Gizzy said:
Interesting plan Trevor; looks like you have added a reversing chord too....

Without the Reversing Chord the cat flap would be one way traffic only. :bigsmile::bigsmile::bigsmile:
Ah, now that I've seen the revised track plan, I see why.

I see that you have connected 'phase 2' to the rest of your layout, via the shed, to give a continuous run.

Like it Trevor....
 
Gizzy said:
Round n Round said:
Gizzy said:
Interesting plan Trevor; looks like you have added a reversing chord too....

Without the Reversing Chord the cat flap would be one way traffic only. :bigsmile::bigsmile::bigsmile:
Ah, now that I've seen the revised track plan, I see why.

I see that you have connected 'phase 2' to the rest of your layout, via the shed, to give a continuous run.

Like it Trevor....

Thanks Gizzy

The Reversing Chord was in the first plan posted at the beginning of this thread, its just in a different place now.
 
Round n Round said:
Gizzy said:
Round n Round said:
Gizzy said:
Interesting plan Trevor; looks like you have added a reversing chord too....

Without the Reversing Chord the cat flap would be one way traffic only. :bigsmile::bigsmile::bigsmile:
Ah, now that I've seen the revised track plan, I see why.

I see that you have connected 'phase 2' to the rest of your layout, via the shed, to give a continuous run.

Like it Trevor....

Thanks Gizzy

The Reversing Chord was in the first plan posted at the beginning of this thread, its just in a different place now.
Are you using LGB 1015T to change polarity, or just a switch....
 
Gizzy said:
Are you using LGB 1015T to change polarity, or just a switch....

Switch is one of my middle names, Gizzy, but not just, Wires is another one.
The whole layout is in sections controlled from within the shed.
Eventually five trains will be able to run at once but can be interupted for shunting etc.
6344a1bd31894ffa9e9674fd03115704.jpg
Part of the Control Panel (excuse the rear view)​
 
Round n Round said:
[align=center] [/align] [align=center]Part of the Control Panel (excuse the rear view)[/align]

I was enjoying reading this thread up until then.... :holdon:
 
Gizzy said:
Round n Round said:
[align=center] [/align] [align=center]Part of the Control Panel (excuse the rear view)[/align]

I was enjoying reading this thread up until then.... :holdon:

Blame Mike, he took the photo.
 
:rolf:nice and simple , now the wireings something elase!!!:rolf:
 
Back
Top Bottom