The EM&BHR

Yesterday, I took my Triple header to the Beavercreek Railway Open Day. Superb afternoon.

Through the yard
8e405f8a1a7f40d1addb2ffcc86f6976.jpg


Out of the tunnel
9a86d903147445e4b39b838ecd4972f9.jpg


Yes it is as steep as it looks
dd22a1e9cbb747be9dbe5b66e1aa5ea7.jpg
 
Great video Bigjack, the triple header looks great.
 
Good pulling Steve
Now just get the extra weight on them and we will have to test the set again on the incline to Arbour Summit!!
 
bigjack said:
Extra weight already added Mike :thumbup:
Right-o we will have to get then tested. Another good excuse to play!
 
I have decided to build myself an indoor layout, I want to build it on a modular platform so that I can transport it to shows as well as being able to use it in the shed.

Plans are at the moment being drawn up at the moment, but before I can do too much I have to wait for the track to arrive. Pictures will be posted as thing progress.
 
I've had a delivery today, the boards and battening for the indoor modular layout. I'm using floor boards as they interlock. They were cut in half to make each board 60cm wide
ddf3ef9f465c4c6b8c59a12a0f062be4.jpg
 
I used the battening to tie 3 pieces of board together, making each length 98cm. This has made 4 sections that just slot together.
Here is one piece that I just made
c3515d60f4c64d898f924e24cf164d7f.jpg


Here are the 4 sections put together, with a piece of teas track on it.

673925919e2541fea28c075023d4dc94.jpg


I'll do a little more tomorrow, if the shoulder is up to it.
 
Good start Steve, :thumbup: take care of that shoulder though.
 
should keep him out off mischief for all off 10 minurtes:thumbup:
 
You've tidied up the shed to boot as well :bigsmile:
 
It's not to bad to be honest with you, it just awkward lifting it with a gammy shoulder.

I've laid them out in 4 sections, each section has 3 pieces of board making each section approx 60cm wide x 100cm long.
 
bigjack said:
The track has arrived for my indoor/portable layout.

images
So you'll have it finished by the weekend then mate....
 
Gizzy said:
bigjack said:
The track has arrived for my indoor/portable layout.

images
So you'll have it finished by the weekend then mate....
In an ideal world, yes.





But as I don't live in an ideal world. Then no :bigsmile:
 
Done a little to the indoor/portable layout today.

I've painted the baseboard with a stone finish paint, just have to wait for it to dry.
2b5ee9d866b2468c889ef14527974aa4.jpg


I've laid the points on just to see how they looked. Here they are in place.

ffc33c698ccf475884eed147979d918b.jpg


The join between the point at the top right and the 2nd point is half way on the board.


a13d625855d14d91b9aeac1e0e27dc11.jpg
 
Back
Top Bottom