Copper Mine revamp

ge_rik

British narrow gauge (esp. Southwold and W&LLR)
Country flag
If you recall, I had to renew the baseboards at Beeston Market Station and the Copper Mine last year. I've been steadily sorting out BM, and have now made a start on titivating the CM.

The buildings have been there for some years now.......
IMG_4825.JPG

...... but I was never happy with the Gn15 .....
IMG_4836.JPG

..... and later the SM32 feeder lines
IMG_9047.JPG

So, after a bit of head scratching, I decided to reorganise the buildings requiring judicious use of a circular saw, a hand saw and much grunting and a fair bit of muttering. The feeder will now approach the buildings from the opposite end, making the layout a bit more manageable.

DSCI1161.JPG

Just need to figure out how the 32mm track will be supported (trestle, embankment, stone piers?)
DSCI1165.JPG

DSCI1163.JPG


Rik
 
It's taken a couple of weeks, but I've more or less finished the revamp of the Copper Mine.

Freelance (HGLW) 2' gauge diesel, LINDA, propels three skips up the incline from the copper mines to the crusher shed and loading chutes.
DSCI1212.JPG

Ruston 44/48HP loco NICK, shunts tipplers below the loading chutes to be filled with spoil
DSCI1215.JPGDSCI1220.JPG

NICK shunts more tipplers below the loading hopper to be filled with crushed copper ore.
DSCI1223.JPG

Fowler 0-4-0DM TOLLEMACHE arrives with a train of empty tipplers to be exchanged for the now filled train of tipplers for transportation Up the line to Beeston Market.
DSCI1226.JPGDSCI1230.JPG

Fortunately, the Copper Mine is under the shade of trees in the afternoons and so I was able to work without getting too scorched.

Rik
 
Wow heck of a gradient but I guess the revised arrangement gives you lots of ‘play’ appeal, I can imagine just running the hoppers to and fro with loading could loose an hour or two.
 
Wow heck of a gradient but I guess the revised arrangement gives you lots of ‘play’ appeal, I can imagine just running the hoppers to and fro with loading could loose an hour or two.
The loco has been programmed for auto shuttle, so happily goes to and fro without any intervention from me.
If only I could figure out how to fill and empty the skips automatically........

Rik
 
A couple of videos of the Copper Mine in action.

Firstly, how the tipplers operate



And secondly, a typical day in the life of the mine.


Rik
Some small chain under the slides will help ensure more stone goes into the wagons below as per the real thing, did try to find some pictures for you but I think I saw this on a series of articles about Iron Stone Quarries in possibly the Modeller c 1960-90!
 
Some small chain under the slides will help ensure more stone goes into the wagons below as per the real thing, did try to find some pictures for you but I think I saw this on a series of articles about Iron Stone Quarries in possibly the Modeller c 1960-90!
Nice idea.

Rik
 
Back
Top Bottom