railaddict
Registered
In July, I cleaned the track from the mixture soil/ballast/gravels that had accumulated with the years of kids running on the track. The point leading to the workshop had even been buried. Unfortunately,the motor didn’t last and I’ll have to replace it.








Ithen set about ballasting the track again and adding gravel to markout the ballast bed. Here you can see the different stages.










Before ballasting, however, I had to sieve the different types of gravel and
ballast to separate them and remove the soil that had got everywhere,which explains the many hours spent sieving.

Filling the bags with mixture.

How it looks, coming out of the bag.

Separating the different elements.








Ithen set about ballasting the track again and adding gravel to markout the ballast bed. Here you can see the different stages.










Before ballasting, however, I had to sieve the different types of gravel and
ballast to separate them and remove the soil that had got everywhere,which explains the many hours spent sieving.

Filling the bags with mixture.

How it looks, coming out of the bag.

Separating the different elements.




