Richie
Rio Grande Railroad , Mountain biking , Gardening
Have wanted a bulldozer to go with my log train for some time now but have had no luck finding one that was until Steve at Back2bay6 had a second hand one at the Telford Show sat on a unknown make of flat car could be a Hartfords but not sure . The flat car and bulldozer have been poorly painted so i thought about building a Beaver Tail flat car to carry the dozer as i remember seeing one on a video of a work train on the Durango & Silverton . To start the build i needed to make the deck longer as the Bachmann trucks and couplings were to far away from the deck .Cut both ends off and then on one end cut the deck with a V so that i could bend the deck down to make the beaver tail . Then cut out some plastic card for the flat car bodie sides making it 15mm longer each end ,the ends which were removed earlier were then glued back in place making the deck 30mm longer . The deck was then finished off with the good old wooden coffee stirrers . Found a tool box from a old Bachmann tender that sits on the front to house the chains also the chain hooks on the deck came from the lift bar brackets of a old Bachmann flat car . Just needs painting and weathering now and the bulldozer will get a new coat of paint too .
Pic of Bulldozer on flat car when i got it

Pic of Bulldozer on flat car when i got it








