AsorA Bahn

@PhilP and @duncan1_9_8_4 thanks. I am liking the plants the most. The rock stuff is good and all, but I always envisioned the railway being filled with greenery.
There are 2 types of babys tears or mind your own business I think, the name seems to be interchangeable. You can see them either side of st peters station, the more aggressive one is doing a great job of covering the rock wall.
The coral looking plant beside the pond is called "the blob", there are 6 of them around the railway, all planted at the same time. You can see the size they start off at in front of the snow shelter about 4", the lime green circle amongst the baby's tears. It has hardly grown like the 4 others. 2 have taken off and do a great job of filling in the space. Maybe the name is generic and there are different types?
 
Got the arvo to work on the railway today, some nice progress made.
IMG_20261024_143933680_HDR.jpg
The heavy larger block with the rebate cut into was where the bridge started before. Left it in, didn't want to wreck the road behind it.
I made the bridge smaller to bump the points to the right, making the passing loops and siding longer.


IMG_20261024_145859865_HDR.jpg
A bit of roadbase, some sand and a bit of leveling out and the base is prepped.


IMG_20261024_180823266_HDR.jpg
Blocks cut and dropped in place and leveled off, well not quite. The siding has a slight slope to make sure any wagons left there don't roll out onto the track.
The blocks make a nice sturdy base to stand on for maintenance.
IMG_20261024_180832969_HDR.jpg
This is as far as i got before the rain started.
The H4 sleeper will be the bridge base. Still needs the rebate cut into the left side to clear the rocks and a bit of adjusting to level it out. A couple of coats of black paint and it should last a good while. Later on sides of foam sheet to simulate a RhB rock faced 2 arch bridge should look ok.
Very close to getting trains running again :).

IMG_20261024_182816864_HDR - Copy.jpg
Had to dig a bit of baby's tears out near the siding, replanted straight into this little bit mortared in yesterday.

IMG_20261024_182905551_HDR - Copy.jpg
My very useful helper how else could I use the bricksaw or angle grinder without his constant barking, ummm supervision I mean. :D
 
Got the arvo to work on the railway today, some nice progress made.
View attachment 362398
The heavy larger block with the rebate cut into was where the bridge started before. Left it in, didn't want to wreck the road behind it.
I made the bridge smaller to bump the points to the right, making the passing loops and siding longer.


View attachment 362399
A bit of roadbase, some sand and a bit of leveling out and the base is prepped.


View attachment 362400
Blocks cut and dropped in place and leveled off, well not quite. The siding has a slight slope to make sure any wagons left there don't roll out onto the track.
The blocks make a nice sturdy base to stand on for maintenance.
View attachment 362401
This is as far as i got before the rain started.
The H4 sleeper will be the bridge base. Still needs the rebate cut into the left side to clear the rocks and a bit of adjusting to level it out. A couple of coats of black paint and it should last a good while. Later on sides of foam sheet to simulate a RhB rock faced 2 arch bridge should look ok.
Very close to getting trains running again :).

View attachment 362403
Had to dig a bit of baby's tears out near the siding, replanted straight into this little bit mortared in yesterday.

View attachment 362402
My very useful helper how else could I use the bricksaw or angle grinder without his constant barking, ummm supervision I mean. :D
I spy with my little eye a larger radius point beginning with Peco!
 
Been able to get a bit done this week, amongst other work.

IMG_20261027_173253032_HDR.jpg
Bridge base finished and painted, behind it is the catenary section to go into the newest tunnel.

IMG_20261028_160118934_HDR.jpg
In place and nice and level, each end sits on gal screws driven in from underneath. A easy way to level it and keeps the timber off the rocks.

IMG_20261028_161348013_HDR.jpg
Lifting some of the old ballast to realign the tracks, it breaks up easily.

IMG_20261028_180306732_HDR.jpg
Track going in, under Doggo's expert supervision.

IMG_20261028_180249273_HDR.jpg
The track is held in place with rawl plugs and is nailed down. Uncoventionable maybe but it is quick, easy and the small gal nails are very unobtrusive.
Has seemed to work well so far.

IMG_20261028_183031320_HDR.jpg
Yeah after a 4 1/2 months with no trains running, I can sit and watch trains go round and round again :) .

Short test train making sure everything works. The siding can now hold 2 log wagons and the loops behind are 1 short wagon longer too.
This will make operating more fun I hope.

Next will be to ballast this section and make the crossing again.
 
Last edited:
Been able to get a bit done this week, amongst other work.

View attachment 362545
Bridge base finished and painted, behind it is the catenary section to go into the newest tunnel.

View attachment 362546
In place and nice and level, each end sits on gal screws driven in from underneath. A easy way to level it and keeps the timber off the rocks.

View attachment 362547
Lifting some of the old ballast to realign the tracks, it breaks up easily.

View attachment 362548
Track going in, under Doggo's expert supervision.

View attachment 362549
The track is held in place with rawl plugs and is nailed down. Uncoventionable maybe but it is quick, easy and the small gal nails are very unobtrusive.
Has seemed to work well so far.

View attachment 362553
Yeah after a 4 1/2 months with no trains running, I can sit and watch trains go round and round again :) .

Short test train making sure everything works. The siding can now hold 2 log wagons and the loops behind are 1 short wagon longer too.
This will make operating more fun I hope.

Next will be to ballast this section and make the crossing again.
Absolutely incredible craftsmanship! Can’t believe this all started with some dirt and concrete.
 
Took the opportunity to run a train.
First proper train in months, went pretty smoothly. Just a couple of stray ballast pieces caused a few derailments here and there, easily fixed.
IMG_20261104_131140743_HDR.jpg
IMG_20261104_132440587_HDR.jpg
IMG_20261104_140400214_HDR.jpg

Testing passing siding capacity.
IMG_20261104_135405857_HDR.jpg
IMG_20261104_135057789_HDR.jpg
Very happy, a 4.2m train will fit in either loop now, and 2 log wagons in the siding. I don't have enough stock to do either at the moment thou :D.

IMG_20261101_173543956_HDR - Copy.jpg
IMG_20261103_234001924_HDR.jpg
Have had a chance to do a little work, started on the next tunnel mouth.

IMG_20261104_140339432_HDR.jpg
IMG_20261104_135504941_HDR.jpg
Bit of a gap in the temporary bridge track, I was going to fix it but it causes no derailments so have left it be:).

IMG_20261104_143705103_HDR.jpg
Doggo waiting to play frizzbee, i mean work its serious business.
 
It looks like your plants are maturing nicely and softening the hard landscaping. There's nothing like watching trains moving through the landscape!
 
Took the opportunity to run a train.
First proper train in months, went pretty smoothly. Just a couple of stray ballast pieces caused a few derailments here and there, easily fixed.
View attachment 362781
View attachment 362782
View attachment 362783

Testing passing siding capacity.
View attachment 362784
View attachment 362785
Very happy, a 4.2m train will fit in either loop now, and 2 log wagons in the siding. I don't have enough stock to do either at the moment thou :D.

View attachment 362786
View attachment 362787
Have had a chance to do a little work, started on the next tunnel mouth.

View attachment 362788
View attachment 362789
Bit of a gap in the temporary bridge track, I was going to fix it but it causes no derailments so have left it be:).

View attachment 362790
Doggo waiting to play frizzbee, i mean work its serious business.
First one I've seen of him lying down, almost quietly :D
 
G’day Stewie, nice to get an update now you are on better weather as we head into end of season. Likely last operating day if the year here, unless we get some more mild dry weather. I forgot to ask @Gizzy, @Paul M is on holiday so I understand. Love to see your supervisor Doggo in attendance.
 
G’day Stewie, nice to get an update now you are on better weather as we head into end of season. Likely last operating day if the year here, unless we get some more mild dry weather. I forgot to ask @Gizzy, @Paul M is on holiday so I understand. Love to see your supervisor Doggo in attendance.
Hi JonD, hope you can get a few more operating days in.
It will be a long time before I can get Arosa station extension going and track bought so operating can start.
Have given a fair amount of thought to operating and traffic thou.
Even got AI to write me a program to randomise traffic and list a weeks timetable, based on the parimeters I gave it :) .
 
Hi all I have managed to get a little bit done this week on the railway, have been too sore and tired to make the most of any spare time I have had.

IMG_20261114_184150643_HDR.jpg
Been a 2 steps forward 1 back kind of week, I made a mistake and didn't use the log wagon as the clearance wagon. It is bigger than everything else, as I found out this week.
So the 2 tunnel mouths headed back to the workbench for a fix up. Not a big deal, but the rockwork doesn't quite line up at the tunnel edges anymore.
IMG_20261115_092634106_HDR.jpg
This tunnel mouth got some surgery in place, looking pretty rough thou. Will be replaced later on when the temporary loop is removed, so not a big deal.
A bigger mistake, is the middle of the log wagon hits the catenary mast on the left and it will have to be removed and a wider frame made. Hopefully I can re use the mast at St Peters station, should be ok for clearance on a straight section.

IMG_20261115_092846640_HDR.jpg
IMG_20261115_092817396_HDR.jpg
Both fixed up and tested out ok, ready to have the grout finished off and a varnish. Not too noticeable that the rockwork around the archs doesn't line up anymore.

IMG_20261115_094102913_HDR.jpg
Heading out to do a few laps.
IMG_20261115_095612411_HDR.jpg
IMG_20261115_095553711_HDR.jpg
Of course someone had other ideas on how we should be spending our time off :rolleyes:.
Unfortunately rain called a halt to the days fun.

IMG_20261115_102109336_HDR.jpg
IMG_20261115_101859345_HDR.jpg
IMG_20261115_101928849_HDR.jpg
I thought maybe the greenery might be taking over a bit too much, but.

Screenshot 2026-11-09 133046.png
Screenshot 2026-11-09 132046.png
Matches these screen shots from a cab ride video of the Arosa line I watched the other night not too badly, and looks like letting it grow onto the tracks can be prototypical too:rofl:.

Screenshot 2026-11-09 132411.png
Also from the same 2013 video by claus Dunsch, a down train pulling into litziruti station. The most freight wagons on a mixed train I have ever seen a video of on the Arosa line. Nice mix of wagons too.



He has also recently uploaded this 2013 video showing how the arriving up train picked up empty hoppers from the concrete plant and reformed the train at Arosa station. Lots of moves made, looks like the station shunter attaches the empty hoppers to the back of the train too.
A lot of details in this video for me to use making a model of Arosa station.
I have seen a few videos of around this time showing trains running without control cars, I wonder if it wasn't done then or they were temparily out of service/shortage of them?. Either way a much more fun way for me to operate the railway, having to run the loco around the train at each end.

Screenshot 2026-09-08 082604.png
Have spent a bit of time relaxing watching videos this week, happened across a video showing this at Arosa station, i think around the 2010 time period.
Didn't take note of the video so I can't credit the author for their work.

I am looking to make a model based loosely on the 2010 to now time period. I am aiming to run it in a mostly prototypical way,but there will be a mix of traffic that never happened together but makes sense to run on the Arosa line in general. So no long freight trains of Valser containers,or post vans, or coop containers, glacier express or GE 4/4iii's kind of deal, but not a slavish rivet counting copy either is what i had in mind, and yes I am perfectly ok running old bernina line coachs. They were $150- $200 cheaper per coach than all red ones so its ok to pretend:D.

I plan to make Arosa station in its old pre 2014 make over layout. With the goods shed still in operation, not turned into a restuarant. Seeing the above wagon it looks like the post used to come by train, to the goods shed maybe? I know there is a post office down from the station nowadays.

In that line of thinking the above modified post van would be a nice addition to the dailly traffic, or even a single shiny new yellow postcontainer would make sense to me. Attached to a mornings up passenger train even thou that doesn't happen in real life.

Next few weeks looking to be way too busy aswell, so probably not a lot will get done on the railway.
 
Last edited:
Back
Top Bottom