Graham ASH
Fn3 Logging & Mining
Ive been off here for 4 weeks as Ive been moving house. The benifits of this is that I now have a back garden, which measures 80ft long, by 18ft wide at the house end and 16ft wide at the top of the garden, the garden also rises from the house about 3ft to top of the garden.
I intend using Peco Code 200 track, and would like to build a Logging / Mining layout in this area. There are no restrictions to building, but I reckon it will make a superb area for what I have in mind. I will be running it on DCC which will be inside - any ideas / thoughts please.
I would like to incorporate at least two trestle bridges
Graham
I intend using Peco Code 200 track, and would like to build a Logging / Mining layout in this area. There are no restrictions to building, but I reckon it will make a superb area for what I have in mind. I will be running it on DCC which will be inside - any ideas / thoughts please.
I would like to incorporate at least two trestle bridges

Graham