I have just obtained some secondhand 2 and 4 foot length LGB striaght track.
However, when it was lifted some damage occurred, in so much as, some of the rails popped out of the retaining clips on the sleepers, so in order to repair it I know that I must slide the rails clear of the place where the track has come out the clips and then re-insert the rail!
Pretty easy with the two foot lengths, but it is the four foot ones, which have set me thinking! LGB striaght track is based on 30cm units, and the sleepers mouldings are that size, so for a 4 foot (120cm) length of track 4 sleeper moulding are used, to maintain the correct sleeper spacing, LGB track has two fishplates used as spacers every 30cm.
As I need to deal with centre sleeper panels on some of the 4 foot lenghts, can I please ask, if anyone has any advice, tips, etc for removing and replacing these intermediate spacer fishplates?
However, when it was lifted some damage occurred, in so much as, some of the rails popped out of the retaining clips on the sleepers, so in order to repair it I know that I must slide the rails clear of the place where the track has come out the clips and then re-insert the rail!
Pretty easy with the two foot lengths, but it is the four foot ones, which have set me thinking! LGB striaght track is based on 30cm units, and the sleepers mouldings are that size, so for a 4 foot (120cm) length of track 4 sleeper moulding are used, to maintain the correct sleeper spacing, LGB track has two fishplates used as spacers every 30cm.
As I need to deal with centre sleeper panels on some of the 4 foot lenghts, can I please ask, if anyone has any advice, tips, etc for removing and replacing these intermediate spacer fishplates?