
Following on from the Post on building a Class A Climax, I thought that this beast would be of interest to some of you out there. It is work in progress, in fact it has never been out of the box since I moved in 2000. So I am not sure what to do with it.
The power units are two "Stomper" Chassis wired into the switches. Two that you can see, the big one in the cab for Forward/Reverse the Green one in the coal bin is an On/Off Push button that latches. Most of the construction has been Wooid and Plasticard with Plumbing Plastic Pipe for the Boiler, ciut down the middle to do the different steps. The Chimney is a piece of Plumbing Pipe, not put on completely strait.
It does run OK, but will never be a great winner in the haulage stakes.
For those of you who do not know what a Price D is, they were used on Logging Lines in New Zeeland.
JonD
The power units are two "Stomper" Chassis wired into the switches. Two that you can see, the big one in the cab for Forward/Reverse the Green one in the coal bin is an On/Off Push button that latches. Most of the construction has been Wooid and Plasticard with Plumbing Plastic Pipe for the Boiler, ciut down the middle to do the different steps. The Chimney is a piece of Plumbing Pipe, not put on completely strait.
It does run OK, but will never be a great winner in the haulage stakes.





For those of you who do not know what a Price D is, they were used on Logging Lines in New Zeeland.
JonD