With the near completion of my first two "lift out" bridges, and a dry afternoon, I thought I'd make a start on my track alterations.
I have lifted the approach track to the high level section and my only siding and headshunt. I've left the main line because this will have to be cut for new pointwork and crossing. Started all this and the weather is going to turn! C'est la vie!
Bridges in approximate position
A previous "try it and see" with the components
Old LGB R1 points to go
Track slewed for new connection to high level
At least I can still run (if weather permits)