Terrible weather is not allowing me to attack the track relay and other jobs ready for the Spring so around to thinking about roundtoit jobs I can get on with,first on a long list was a replacement freight depot for Apache Falls as has been on the cards for a few years.The original was a throw together when I first started outside.A simple box construction of plasticard and strip,the roof is still to be finished and has individual tiles(shingles) glued on one at a time,the rear overhang is shorter to go into the original location on the spur,at the moment it`s in first coat colour and the pics taken with the paint still wet.window,doors,the freight doors will slide open and some work to do on the underside of the roof, a few bits of interior detail and slight weathering should finish it off,the roof and dock are still removable.
Last edited:
- 6
- Show all