James Day
Guano Corner Rly - Runs weekly - Guano permitting

A nce idea. Looks great and runs very smoothly.
An automated branch line can really add something to the layout. Extra movement going on, without human intervention.
I have short autoamted branch that currently goes from a single bay platform, up to a two road terminus.
Here is a video my chum took in the recent snow.
http://www.youtube.com/watch?v=44b41R3iwv0
Since the video was taken the set up has been modified so that the train swaps over with another waiting in the second road at the terminus. This adds even more fun.
I am about to have some drainage installed on my lawn, which will mean clearing away part of the main line circuit whilst the work goes ahead. But when the track goes back I am intending to add another automated point at the lower end of the branch to allow the train to serve to seperate stations.
This will then allow three trains to shuttle up and down between to alternate lower stations and the two alternate top platforms.
Best wishes,
James
An automated branch line can really add something to the layout. Extra movement going on, without human intervention.
I have short autoamted branch that currently goes from a single bay platform, up to a two road terminus.
Here is a video my chum took in the recent snow.
http://www.youtube.com/watch?v=44b41R3iwv0
Since the video was taken the set up has been modified so that the train swaps over with another waiting in the second road at the terminus. This adds even more fun.
I am about to have some drainage installed on my lawn, which will mean clearing away part of the main line circuit whilst the work goes ahead. But when the track goes back I am intending to add another automated point at the lower end of the branch to allow the train to serve to seperate stations.
This will then allow three trains to shuttle up and down between to alternate lower stations and the two alternate top platforms.
Best wishes,
James