Eighton Bahn AKA testing testing RhB

wandgrudd

Registered
24 Oct 2009
443
57
....
Best answers
0
Country flag
Nodrog1826

Any chance of a walk though of how you fitted the Massoth Auto Couplers did you retain the standard LGB chip etc.? (by fitted a mean integrated in to the lgb chip etc.)

Thanks.
 
  • Like
Reactions: 1 user

PhilP

G Scale, 7/8th's, Electronics
5 Jun 2013
33,593
3,525
Nottingham
Best answers
0
Country flag
Nodrog1826

Any chance of a walk though of how you fitted the Massoth Auto Couplers did you retain the standard LGB chip etc.? (by fitted a mean integrated in to the lgb chip etc.)

Thanks.

? Do you mean the cover plates on the points ? - Or have I missed something? Again! :rolleyes:
 

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
You know when you get a daft idea, and you just have to try it out on paper, to prove the concept.

Well...

IMG_20180601_180302.jpg

...the MPD is going to be a four road, poss. five road, one, and for good measure, it now has determined where the building is going as well.
 

PhilP

G Scale, 7/8th's, Electronics
5 Jun 2013
33,593
3,525
Nottingham
Best answers
0
Country flag
It will never work!

Wax crayon won't transmit power to the loco's! :rofl::rofl::rofl::rofl::rofl:
 
  • Like
Reactions: 1 users

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
It will never work!

Wax crayon won't transmit power to the loco's! :rofl::rofl::rofl::rofl::rofl:

Chalk, it's chalk...mind it wont work either
 

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
...anyhow crayon/chalk issues aside.

Yesterday a fight with blunted/scrapped cutting disks and extension supplies, which I won, and the arrival of more bits, time to sort out a few issues.

Two issues, sort out MPD track layout and edging of island platform track.

Then...

IMG_20180608_132950.jpg

...and now.

IMG_20180608_174403.jpg

...you sort of get the idea, MPD office will be the battery/switch cover for the building/station lights, there is even a duct to run the wires up inside.

Still need to get a hold of a few items, couple of sleeper buffer stops, R1 curve (Either hand :eek:.) or make one, and four manual point switches...

The inner platform is next in line :eek: for treatment, cutting disks excepted...
 
  • Like
Reactions: 1 users

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
Activity today...

Inner platform edge support and building slab (foundation) works...

IMG_20180610_123948.jpg

...the gap will be closed when I get some better slab cutting disks.

...Hook up wires for the building and platform lights...

IMG_20180610_130731.jpg

...4 x 20 yards approx. lengths, all twisted by hand...

IMG_20180610_124919.jpg

...O.K., by drill, but it was hand held, so it counts.;)
 
  • Like
Reactions: 1 user

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
Some of that hook up wire has been put to use today...IMG_20180611_222748.jpg

...test of 3v led lights.
 
  • Like
Reactions: 1 users

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
Have now taken the lighting testing a stage further.

Fully charged AA batteries, set up and left on overnight, to see how long the would run for...

P1020499.JPG

P1020503.JPG

P1020505.JPG

P1020506.JPG P1020512.JPG

P1020513.JPG

P1020517.JPG

P1020518.JPG

...still running after 13 hours...:)
 
Last edited:
  • Like
Reactions: 1 user

Rhinochugger

Retired Oik
27 Oct 2009
36,774
4,243
North West Norfolk
Best answers
0
Country flag
HOW long ?? :eek::eek::eek::eek:
 

stockers

Trains, aircraft, models, walking, beer, travel
24 Oct 2009
25,631
3,795
65
Nr. Ashford, Kent. England.
Best answers
0
Country flag
My locos need to run that long Gordon!
 

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
Not too short of 24 hours now, someone left the lights on whilst the additional detailing was installed.

P1020519.JPG

...impromptu weather test as well, unexpected downpour this afternoon, and no one was home.
 

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
Well here we are just short of 36 hours, lights are still going.

P1020524.JPG

P1020528.JPG

After the rain yesterday, early indications were that another sort of soaking was pending this morning, but he didn't. :whew:

So I think my evening running session lighting set up can count as a success.:clap:
 
  • Like
Reactions: 1 users

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
Lighting trials suspended at the 40 hour mark.

Have now wired up the outer platform lights, and ran an extension cable from the station building to the MPD battery hubs. Batteries on charge to see how the platform lights perform later.

Father's Day gift included two more Airfix Quickbuild kits, so added scenery as it were...

P1020531.JPG

...even the MPD staff are in on the act...

P1020529cp.jpg

...but questions abound as to the generosity of the MPD foreman's new pay package...

P1020532.JPG
 

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
Outer platform lights were hooked up yesterday, and tested last night...

P1020538.JPG


P1020547.JPG

P1020548.JPG

P1020549.JPG

...the odd dodgy photo aside, pleased with the results. :)
 
  • Like
Reactions: 1 user

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
Inner platform lights installed today, not wired up yet...

P1020550.JPG

P1020552.JPG

P1020555.JPG

...MPD building locating, locators installed...

P1020553.JPG

...with all this activity, I may as well start thinking about the "Dive under bridge extension" jigsaw...

P1020558.JPG
 
Last edited:

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
Inner platform lights were connected yesterday, was almost finished when the rain arrived, so sod it, finished the job.

P1020568.JPG

P1020573.JPG

P1020571.JPG

P1020572.JPG

Minor disaster with the connection of the last fitting, I snapped it, but a spare was soon in place...

...more of my dodgy camera skills as well...

...Have to say it has turned out better than I thought it would.
 
  • Like
Reactions: 3 users

Nodrog1826

Professional Idiot
21 Nov 2013
8,997
2,732
United Kingdom
Best answers
0
Country flag
Battery power test today, incorporating the use of the "new " composite picnic table, well you have to put the stuff down somewhere...

IMG_20180622_172445.jpg

...18v battery power, all lines traversed, Darlo branch, only up to the shed lines, which were blocked by the engineering dept., cleaned at stall points, and points as well...
(Memo to self, must pack up the tools on the shed lines tomorrow.)


IMG_20180622_171503.jpg

...little MOW did a couple of dozen circuits in various directions...

IMG_20180622_171704.jpg

IMG_20180622_171647.jpg
 
  • Like
Reactions: 1 user

Slawman

Deckline
9 Apr 2018
323
83
Sydney
Best answers
0
Country flag
Good show. I like the way the platform lights look the brightness looks spot on.