Hello, im planning a shuttle for my rack line im building. At the moment im working out the point change i have planned. i will probably ask for help with the DCC set up later using feedback modules.
Im planning on having 3 stations, 2 at lower level and one at the top of the climb.
The train will depart station 1 and when the train reaches station 2 it reverses down another line to station 3 and then back again in reverse.
I have set the timer on the massoth 8156001 so when it passes over a reed switch it changes to the correct line but it only last around 1 minute at maximum waiting time from what i can tell. I would like to leave the train on the top for over a minute
I have dabbles with multiple reed switches but make the point always point into one direction.
Any other ideas welcome.

Im planning on having 3 stations, 2 at lower level and one at the top of the climb.
The train will depart station 1 and when the train reaches station 2 it reverses down another line to station 3 and then back again in reverse.
I have set the timer on the massoth 8156001 so when it passes over a reed switch it changes to the correct line but it only last around 1 minute at maximum waiting time from what i can tell. I would like to leave the train on the top for over a minute
I have dabbles with multiple reed switches but make the point always point into one direction.
Any other ideas welcome.