CFR station Buildings.

Yes indeed Jon, but Gwyneth is adamant that there will be no Garden Railway. She’s tolerating my building kits and refurbishments to the extent that I have taken over the conservatory as my workshop.
Would you like to make a few kits for me Paul?

I don't seem to gave the time atm....
 
Yes indeed Jon, but Gwyneth is adamant that there will be no Garden Railway. She’s tolerating my building kits and refurbishments to the extent that I have taken over the conservatory as my workshop.
You'll have to brush up on your Stealth Tactics, one of the garden railwayer's main skills
 
Yes indeed Jon, but Gwyneth is adamant that there will be no Garden Railway. She’s tolerating my building kits and refurbishments to the extent that I have taken over the conservatory as my workshop.
More sweet talking, chokies and flowers required me thinks!
 
The Welsh station buildings have returned to the CFR:-
898FA428-24FF-4DDA-8974-B06CD06200ED.jpegF64FD8C4-C6FF-445C-ACA2-F7D3AB7BF4D7.jpeg
The weeds are taking over during the lockdown.
 
It’s 10pm and Hermes have just delivered another parcel from those good people at ModelTown. I will be unpacking the parcel in the morning.
 
Had a Parcel Force delivery at 07:14 this morning.. We were out delivering the papers, so it was left on the front doorstep, with a 'green-waste' wheelie bin pushed-up against it..

Looked most odd, when we returned from the round..

:clap::clap: To all those delivering, at the moment! :clap::clap:
 
Box unpacked:-
4D94B150-DE98-493A-873E-AD63127A8A40.jpeg
I have stone walls, a water tower, a ground level signalbox and platforms.
First task is to wash all the mouldings and then let them dry.
Second task will be to prime and undercoat the mouldings.
 
The new station for the CFR is starting to come together:-
F6EBA817-C659-42F4-9FDA-BEC8A17C40C4.jpeg
New platform, water tower and Signalbox.
 
This is the rear view of the new station:-
DE65A101-E44A-4231-8EE9-2A54DEA590AD.jpeg
Only visitors standing on the platform at Rothley Station will see this view.
 
Paul all looking very good and nicely coordinated.
 
Casey
Is this Great work being done @ your temp. housing ?
Indeed it is Sean. But I’ve just been informed that the latest buildings need to join the others back at the CFR along with some of my tools. I don’t want to push my luck, there will be some more buildings to do in a week or so. :)
 
That turnout on the upper level must scare the daylights out of the engineer! Is that a washout, or the future site of a purpose built culvert?

Greg
Greg. Part of the embankment fell away during track modification. It will be reinstated as soon as possible.
 
Back
Top Bottom