The Wenlock Edge Landwasser
So my eye is always on the MOB but I do love how the RhB Landwasser Viaduct looks and how the trains come straight out of a tunnel in the rock onto a bridge across the gorge so I had to have this.... So this is my starting point for the whole railway. The Gorge was dug out earlier this spring with the mini digger but now i just started lining this with the rocks.
View attachment 361653
this is not going to look pretty until the concreate weathers and as we aon clay here the ground has settled
After several weeks of moving the odd boulder, working out the curve and how these will interact with the Conreat curved bridge I have inherited from my Dads old layout. This fairly difficult to create to be honest but hetting the first curve out of the tunnel was the hardest.
View attachment 361654 View attachment 361655
View attachment 361656 View attachment 361658
I dont like tunnels ! They will be there but short and avoided on my layout. I used a cut off a a large land drain i had used to divert the stream in my garden for the tunnel
View attachment 361659 View attachment 361660
It look for some reason I didnt take many pictures after this for a while, so the next photos are all taken today on the 1st october. There was quite a lot of movement over the summer so the bridge within a few months had gaps and cracks which had tobe repaired.
View attachment 361661
I am also using a MOT base with self compacting gravel or Hoggin surface for a path running across the Garden so this is what is going in next.
While doing this I have had to work out how the track will interact/cross with this, I decided on sleepers and the track will be slightly sunk and screwed down into this so that wheel barrows and other items will just walk over it. (in theory)
View attachment 361662
View attachment 361668
TRACK BED
My last railway sat on concreate blocks and gravel, but these soon cracked/moved and became uneven. Due to the heavy clay in my garden I am opting for more of floating option so will use MOT for the sub base and compacted then a gravel topping. To contain this im experimenting with some thin wood treated feather edge boards. We will see if this works. I have soaked the boards and then bent them to get the R3 curves required.
Im trying to incorporate as many R3 as possible as most of my stock need this.
View attachment 361664
View attachment 361666View attachment 361665
View attachment 361667
Im not sure how much I will get done before winter sets in, we will see.