Re:Broome Lake & Eastern RR
At last the circuit is complete, but not the railway as there is a terminus and team track/coal"mine" etc to still build before it's finished.. Steve (not of this Parish) did sterling work (thanks Steve) with the lift-out bridge and the final link-up (a sort of golden spike

) while Dud brought along his #1 Grandson Callum, and a section of his Misty Mountail Railroad.
So not only was there a first train to complete the circuit, there was also a first train to tranist between the two railroads.
A great day !
The link :
Dudley teaching Callum the basics :
The first train to transit to link :
The first BL&E train around the completed circuit :