The Claptowte Railway
The rail sides painted and platform walls installed on Baseboard No1. The platform is wider here, to accommodate the station building and other structures. There is a need to install internal walls to support the platform top, but these will have to be installed once the size and shape of the top pieces have been determined, in order to provide the appropriate support. I am awaiting delivery of some A3 3mm plasticard sheet, for the tops, which once glued in place, will be scribed to represent paving slabs. I now need to install a short length of platform walling on Board No 3, to complete the platform for Gernise End Station, which spans three baseboards.
View attachment 362522
David