Running the Piko Clean Machine on the main loop and Fog Bottom bypass while preparing layout for spring/summer season. First loop sends the loco down the new Fog Bottom bypass track. Still working on permanent roadbed for that. Second loop is main line that serves the evil cookie factory and the future industrial expansion. Most of the buildings are still in storage right now. They'll be coming out soon.
- 1
- Show all