SJ Running today

Evening Steve

To be fair is enough to manage what's there so i am happy to keep it as is , your always welcome down .
 
Steve said:
Evening Steve

To be fair is enough to manage what's there so i am happy to keep it as is , your always welcome down .
Sounds like an offer I carn't refuse....... ;)
 
Oh no two Steves on one line, it'll end in disaster - at least as far as the pork pies are concerned :D
Keep up the good work Steve it's all looking good :)
 
Little more progress to day even though the weather was poop

Battens put in to level the incline

 

Attachments

  • RB30.jpeg
    RB30.jpeg
    187.2 KB · Views: 31
And cement put in

 

Attachments

  • RB31.jpeg
    RB31.jpeg
    179.7 KB · Views: 29
32

 

Attachments

  • RB33.jpeg
    RB33.jpeg
    181.6 KB · Views: 33
33


 

Attachments

  • RB33.jpeg
    RB33.jpeg
    181.6 KB · Views: 30
34


 

Attachments

  • RB34.jpeg
    RB34.jpeg
    149.4 KB · Views: 55
35

 

Attachments

  • RB35.jpeg
    RB35.jpeg
    171.6 KB · Views: 61
The railway looks the dog's danglies but I'm starting to get worried about the passengers in the Rigi car :o
 
First hydro-powered cable car I´ve seen. Good thinking, that man. :o ???
 
brillaint steve.. your building it like old one sugar!! 8)
 
Now that is very high praise thankyou Mike
 
Ive nearly run out of the LGB conductive paste for the joints will copper slip do the same job ?
 
should do steve..
 
Steve said:
Ive nearly run out of the LGB conductive paste for the joints will copper slip do the same job ?
Yes it will.. AND, shock-horror! Despite what they tell you it isn't conductive!!
Just keeps the wet, and oxygen, out so stops corrosion..
;) :D ;D
 
A little more progrees today , R1 inner curve to Station rebuild had begun  :o

 

Attachments

  • RB38.jpeg
    RB38.jpeg
    204.4 KB · Views: 40
Back
Top Bottom