various parts of the line after leaf clearing, ready for the grandsons to visit this week
needed a good testing
middle station
viaduct - sea of leaves behind
overgrown cutting
top station
the ash fall leaves stems all over the place - annoyingly cause derailments and block points
2 poor runs with Countess, nothing went right
Phone call to Simon of Anything Narrow Gauge (who phoned me back even though he was on holiday)
Sorted out r/c glitches
Then 2 good runs
It's not as tolerant of lumpy track and uneven points as a RH but getting to grips with manoeuvring and shunting.
Appropriate truck for the coaling siding
Ahh, a good old ash tree. There was a big one at the old house and it caused a right mess in autumn. Love the viaduct, with the railway clinging to the embankment, rather than passing through the central arch.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.