PDR Highland extension up and running

owlpool

Welsh NG in the mountains. live steam
Country flag
an edited progress log from the old forum
branch from the old line to climb 1.5m at 1:33, by horseshoe bends and spirals to reach the rockery (mountain)
from here, centre of picture,
1577-d29e03fa-ba45-4ae7-a728-58aec46dd0d7.jpg

to there - the mountain (rockery)
 
where the branch will start - off the mine siding which will be realigned
1589-9addbb10-362c-4fd8-a44d-f516ce884e23.jpg
 
60m of flexitrack for my birthday - and a Massoth rail bender - from the boss
1593-641f5aa7-9a9a-499f-8e46-244ab3dae637.jpg
 
equipment for the trackbed from a benefactor who has a sawmill and shed company
1599-30737bc0-6f75-465d-93a6-8d50270a1678.jpg
 
into the field - trackwork at the junction in the background
1611-00135553-243f-4ae7-bfe0-acc627acce9d.jpg
 
progress has reached the mountain via 3 horseshoe bends, a spiral and an intermediate passing loop
1614-f3baeae7-877c-4bae-b361-f58ba084aba1.jpg
 
and a top station area with a temporary run around loop - the lower RH point will become the point where the return loop around the mountain will rejoin

1620-4433ca44-80bd-4cd2-aecf-50bdba3d178c.jpg
 
along the way, contours used as much as possible
some cuttings required

1626-228e55bc-96a1-4818-bffc-41b15539c90c.jpg
 
intermediate passing loop - there will be a halt platform in the Vee between the passing loop and the spiral
1628-dead4cbc-2258-492f-b65d-b929974bb12a.jpg
 
Thats looks brilliant , great to see the old threads comming across :)
 
Back
Top Bottom