Operating the GWLR in 2012

shropshire lad

Registered
Country flag
Although still holiday time an oil train ran today and became the first train of 2012.
As certain restictions are still in place during the protracted replacement of the lines suspension bridge the train was photgraphed at Milburn station.
cd87ffa286ca4d2f8c5ede84f520f4ff.jpg

708ab9f4b9c64b0988ef975727eff28b.jpg
 
video=http://www.youtube.com/watch?v=C-5DD4_WRQQ&context=C3ac079fADOEgsToPDskKKHy_oM8xlq1qx1WsqjRsI
Caught running through Milburn station
 
Looking good Colin:bigsmile:
 
shropshire lad said:
Although still holiday time an oil train ran today and became the first train of 2012.

Top man. Small is beautiful! :thumbup:
 
i must be then:bigsmile::thumbup:
 
The permanent way gang have had a busy few days but the thanks to their efforts the railway is fully operational again.
A couple of shots of the works train
917af42946e74db88b3e8129509798d1.jpg

25a762da2fe144c19aac0321a38b58c2.jpg

and a short video of the first service train to use the new bridge observing the tsr imposed on the structure

video=http://www.youtube.com/watch?v=ehCltxV28d4
 
Nice one Shroppylad....
 
a bridge worth its weight:thumbup:
 
With more time available than expected by the engineering team work has commenced on the oil terminal
An above freeezing before pic
f6d0696b92744bf685dc65db6d9f7311.jpg

Too cold for any more work other than tracklaying today
77b82f017e754a7eb3b264fb1318f5b3.jpg
 
shropshire lad said:
Too cold for any more work other than tracklaying today

Your new line is going to need lots of testing Colin. I'm prepared to sacrifice my valuable time to volunteer. :bigsmile:
 