Hi all, Its been a while since I have posted any updates on the railway so here is a video shot on Sunday 21st June. Over the winter the entire track was lifted so the fence could be done. Then when I put it back I edged the track with stone rather than plastic lawn edging I used the first time round. Also, now the line has been extended into and around the shed as well, passed my nice new 1200z which works a treat. Now this is done I just have to try and work out how to fit my new 4 channel switch decoder for the points and a new LS sound decoder from Muns into my Stainz. Hopefully the link below will work and you can see the current state of play. Still loads to do though.
https://youtu.be/yBzXUsuZ27Q
Cheers,
Alan.
https://youtu.be/yBzXUsuZ27Q
Cheers,
Alan.