The danger of having to remove parts of the layout for house renovations has passed. Phew! I was so relieved I immediately began to make some track changes I've been contemplating. I can't stop myself from bringing back the 64mm gauge, even though I still don't have any decent rolling stock for it. Long term project, I guess.
Two test vehicles are visible here, one for each gauge:
View attachment 356601
Same scene, opposite view:
View attachment 356603
In the area nearer the Flamingo, I did a thorough cleaning where every bit of track is lifted in turn, and whatever Mother Nature has dropped in the past year gets removed.
Yesterday at dusk I ran my trusty Eggliner. I hadn't run track power for quite a while, but everything went smoothly.