My layout so far

Really great start made there. Some interesting and varied engineering involved. Should look really impressive when its landscaped. :)
Personally, I'd include another station so you'd have the option to run trains from A to B - but maybe that's phase 2?? ;D

Rik
 
Nice layout Alan!

You've done well....
 
Thanks for the comments. ge_rik there is a second station or maybe docks or something planned at some stage. In the video there appears to be a siding that goes off to nowhere. That's where I plan on heading off. Hopefully once I have sorted out my analog - DCC conversion which I am doing at the moment, I can carry this on.

Cheers,
Alan
 
aovenden said:
Thanks for the comments. ge_rik there is a second station or maybe docks or something planned at some stage. In the video there appears to be a siding that goes off to nowhere. That's where I plan on heading off. Hopefully once I have sorted out my analog - DCC conversion which I am doing at the moment, I can carry this on.
Alan
I suspected there was an extension in the offing - a good idea to have expansion in mind in the early stages to keep the interest going.
Best of luck with the rest of the project. We're always interested on here in seeing how each other's railways develop. Looking forward to seeing further updates (with plenty of photies)

All the best

Rik
 
looking good al,,,,, off to a flockton flyer,,,,,,

look forward to seeing all automatic!!
 
Back
Top Bottom