i dont know brain, you never saw my pipes!!
todays been a day were lots got done, but nothing to see..
street lighting,building lighting and track feeds ring mains went in..
eyelet bolt went into the sub-structurt , every 4ft.. and a large cable tye was losely fastened to the eyelet bolt.. the cables are then threaded through the cable tyes.. so now theres a lighting cable, with in 4ft off all the buildings,same for the streetlamps, and track feeds.. cables terminate inside the fleet storagee fciliaty..(shead)