I've started work on what's been christened the AYUR (as yet unnamed railway), laid some track down on wood and pinned it in place every couple of feet or so with small nails, but I've come to a bit of a halt because the route of the track now needs to follow (for about 6 feet) a path made out of concrete paving slabs.
  
What's the best way to fix the track down to the paving slabs? Small nails aren't going to work
	
		
			
		
		
	
				
			What's the best way to fix the track down to the paving slabs? Small nails aren't going to work