Kircheneckbahn-G Gauge German garden railway

No weeds trying to grow through the turf? Does that happen?
I have some artificial grass on my layout, and yes the weeks grow through, and due to the weave, can be harder to pull up!!
 
No weeds trying to grow through the turf? Does that happen?
The turf I have is rubber backed with small drainage holes weeds came through the holes but were easy to pull out.
Under the old path there is weed control mat.
The weed that grew in the path were in the gravel, with the turf on it the temperature underneath in summer will be enough to kill any weed seeds left over.
Compared to what I had in some areas (weeds knee high) it is a vast improvement.
I am using the off-cuts as grass beside the lines.
I have had "turf" in an area around the swimming pool for about 3+ years no weeds and that is straight onto the soil as well it is still holding its colour no fading but it was done by professionals.
 
The turf I have is rubber backed with small drainage holes weeds came through the holes but were easy to pull out.
Under the old path there is weed control mat.
The weed that grew in the path were in the gravel, with the turf on it the temperature underneath in summer will be enough to kill any weed seeds left over.
Compared to what I had in some areas (weeds knee high) it is a vast improvement.
I am using the off-cuts as grass beside the lines.
I have had "turf" in an area around the swimming pool for about 3+ years no weeds and that is straight onto the soil as well it is still holding its colour no fading but it was done by professionals.
I can see the summer heat killing the weed seeds that manage to infiltrate the turf. Local climate makes a huge difference in results! It gets hot enough here in the summer that I could probably expect similar results.
 
Hi All

Some progress recently, the extension of the railway has started on the opposite side of the garden in the last month or so.
Carrying on from the station area the railways base is now being made from concrete blocks.

Started off with some levelling pegs (left over filcris supports)
IMG_5787.jpg

Then got to work and put in some concrete blocks, four have gone in so far, been far too warm to get any further plus i need to purchase more track.

IMG_5826.jpg

IMG_5827.jpg

Finally a Newquida/Train Bogie coach has been painted into a new livery, this will receive numbers etc in due course.

IMG_5824.jpg

Mark
 
Back
Top Bottom