POLO_Train
Registered

Hello everyone,
I am trying to build my backlog of PIKO buildings during this lockdown, as I won't be able to start my outdoor layout for more than a year out because I need to remodel my bathrooms and kitchen before I should start on a layout (She insists! haha, but also a ton other projects with my new home).
I want to use any buildings built now on my inside Christmas layout this year and wonder if anyone has tried to join PIKO baseplates together under the buildings?
I am building the Sonneberg Depot right now, then finally finish my kitbashed PIKO loco shed, next to the full refinery, and finish with the full brewery (lots of red brick).
I was thinking if I could use 1/8 steel flat bar and cut out the sections and secure it to strengthen the base plates. You can see in the first picture how I am lining up the Depot on the upside-down base plates to figure out where to bolt through the steel bar. I could be over-engineering it. I do that often.
Has anyone tried anything like this?
I thought I might cut out the plastic supports on the bottom and run the steel bar on the bottom. I know this is required but was hoping to try on this build in prep or kitbash loco shed and refinery. Also, Should I try to two-part epoxy to glue the steel onto the PIKO baseplate or just use flat head bolts?
Thanks again for your help!
I am trying to build my backlog of PIKO buildings during this lockdown, as I won't be able to start my outdoor layout for more than a year out because I need to remodel my bathrooms and kitchen before I should start on a layout (She insists! haha, but also a ton other projects with my new home).
I want to use any buildings built now on my inside Christmas layout this year and wonder if anyone has tried to join PIKO baseplates together under the buildings?
I am building the Sonneberg Depot right now, then finally finish my kitbashed PIKO loco shed, next to the full refinery, and finish with the full brewery (lots of red brick).
I was thinking if I could use 1/8 steel flat bar and cut out the sections and secure it to strengthen the base plates. You can see in the first picture how I am lining up the Depot on the upside-down base plates to figure out where to bolt through the steel bar. I could be over-engineering it. I do that often.
Has anyone tried anything like this?
I thought I might cut out the plastic supports on the bottom and run the steel bar on the bottom. I know this is required but was hoping to try on this build in prep or kitbash loco shed and refinery. Also, Should I try to two-part epoxy to glue the steel onto the PIKO baseplate or just use flat head bolts?
Thanks again for your help!