Here is a helpful diagram showing three basic types of funiculars. The earliest ones were four rail (two track) funiculars, but they are the costliest to build because rails are expensive, they take up a lot of space, and they need double stations. More advanced three rail funiculars are less expensive but a little harder to build because they require a passing switch. The least expensive is the modern two rail funicular. They use less iron rails, don’t need double stations, and occupy less real estate, but have the harder to build passing switch. This unique type of funicular was invented in 1890 by Swiss engineer Carl Roman Abt (1850–1933) for the Giessbach Hotel funicular which is still in operation. It was made possible by his innovative and revolutionary ABT passing switch - the only railroad switch without any moving parts! Abt called it the “automatic turnout” solution. It became an instant success and most funiculars constructed afterwards use the ABT design to this day.
View attachment 264921
The funicular now has a reason for being. I've connected the upper station to a 104 ft. long (at 1:24 scale) suspension foot bridge that leads to the re-modeled Treehouse Complex. The two supporting cables of the bridge run through holes drilled in each plank, and are attached to steel disks on the station by magnets to prevent any damage to the station from a heavy falling branch or strong winds. If the bridge is overly stressed, it will automatically disconnect and protect the station. The other end of the cables are attached to the elevator boarding platform at the tree house with miniature turnbuckles for adjusting tension and extension springs to allow for slight motions. The stainless steel cables are the same 1/32" stainless steel cable used in the funicular. The tree house along with a restaurant, salon, gazebo and lodge now has a new Victorian elevator to travel between levels, and it really works!I'm a Yorkshireman abroad - tight fisted when it come to spending! I much prefer making things myself if I can.