
Finally managed to get in to anotate the pics. Here the Corpet is seen crossing my big Steel Viaduct.

Having gone over the Viaduct she circumnavigates the Rockery built in the Winter 2015/16. Van in the rear is the one comming back from Lindenburg.

Arrival at Silberhutte, Corpet cuts off the train to attach the Red Van from Road 1 to the Train in Road 2. German Road Numbering Convention is normally to start with Road 1 at the Station Building.

Having attached the Red Van to the rear the loco will have to run back to the other end of the Train via Road 1 as the points to Riad 3 at the front are now blocked by the poorly stopped Train.

Departing from Silberhutte through the grim looking Factory Area.

Arrival at Alexisbad, things are busy here and the Train will need to do some complex moves to get up to Harzegerode as it is not possible to access the Branch from Road 1 where the train is now sitting. Also the Vans will need to be left behind as there is not sufficient Capacity in the Platform Road at Harzegerode to take them all.
So having cut off from the vans the Train shunts forwards then reverces into Road 2 to then depart to Harzegerode.

Running into Harzegerode through the Factories and Loading Area.

Running round at Harzegerode.

Having attached the van from the Road on the left the driver makes a few adjustments prior to the Guards Whistle.
Having reverced at Alexisbad and coupled the other 3 Vans onto the Train it now arrives at Magdesprung where another van is waiting to be attached.
The van for Magdesprung was inconveniently left in the Main Line in Road 1 so the Train went through Road 2 and is now setting back to attach the Van. At this time the Passengers not in the know will be wondering what on earth is happening.

Here the Train is about to couple up to the inconvinently left Van. It should have been put into the Road by the Goods Shed, but hey ho you just cannot get the Staff these days.

Finally with all 5 vans in tow the Train now departs towards Gernrode.
Passing the latest Rockery.
Running alongside the Pond with all the Water Plants in full bloom.

Before passing Barney the Station Supervisor today at Gernrode.
Yesterday being a nice sort of day and having had a good session with Woodwork in the House I decided to give myself a treat and Andy Rush's former Corpet a run round the line. As is usual I used my normal set of 2 Coaches and a Van Selktalbahn style 10 Axles and my 5 Mail Vans that were dropped off at varying Stations round the line and picked up on the return.
I wanted to annotate this thread with details of the Shunts and other moves that happened. But in view of the problems this morning what the heck. Hope enjoy the pics. Barney was not bothered, he enjoyed the day. It was his 9th Birthday Yesterday. Just love him to bits.
EDIT finally managed to anotate this.
JonD

Having gone over the Viaduct she circumnavigates the Rockery built in the Winter 2015/16. Van in the rear is the one comming back from Lindenburg.

Arrival at Silberhutte, Corpet cuts off the train to attach the Red Van from Road 1 to the Train in Road 2. German Road Numbering Convention is normally to start with Road 1 at the Station Building.

Having attached the Red Van to the rear the loco will have to run back to the other end of the Train via Road 1 as the points to Riad 3 at the front are now blocked by the poorly stopped Train.

Departing from Silberhutte through the grim looking Factory Area.

Arrival at Alexisbad, things are busy here and the Train will need to do some complex moves to get up to Harzegerode as it is not possible to access the Branch from Road 1 where the train is now sitting. Also the Vans will need to be left behind as there is not sufficient Capacity in the Platform Road at Harzegerode to take them all.

So having cut off from the vans the Train shunts forwards then reverces into Road 2 to then depart to Harzegerode.

Running into Harzegerode through the Factories and Loading Area.

Running round at Harzegerode.

Having attached the van from the Road on the left the driver makes a few adjustments prior to the Guards Whistle.

Having reverced at Alexisbad and coupled the other 3 Vans onto the Train it now arrives at Magdesprung where another van is waiting to be attached.

The van for Magdesprung was inconveniently left in the Main Line in Road 1 so the Train went through Road 2 and is now setting back to attach the Van. At this time the Passengers not in the know will be wondering what on earth is happening.

Here the Train is about to couple up to the inconvinently left Van. It should have been put into the Road by the Goods Shed, but hey ho you just cannot get the Staff these days.

Finally with all 5 vans in tow the Train now departs towards Gernrode.

Passing the latest Rockery.

Running alongside the Pond with all the Water Plants in full bloom.

Before passing Barney the Station Supervisor today at Gernrode.

I wanted to annotate this thread with details of the Shunts and other moves that happened. But in view of the problems this morning what the heck. Hope enjoy the pics. Barney was not bothered, he enjoyed the day. It was his 9th Birthday Yesterday. Just love him to bits.
EDIT finally managed to anotate this.
JonD
Last edited: