Tony Walsham
Manufacturer of RCS Radio Control.
Following on from the Dick-Kerr thread.
Hi Phil.
That 42 minute total build time included applying the printed label, drilling the case, testing and buttoning up.
It was for the basic 3 channel version.
Packaging and printing instructions took another couple of minutes each.
I do three 5 channel versions they each took an extra 4 minutes per channel to build and install. Each channel could be soldering the servo leads to pot legs or building and applying smd parts and two push buttons per channel, to a small pcb.
I don't do Selecta, so that makes life a lot easier.
		
		
	
	
		
	
		
	
Plus
		
	
Mounted in the case
		
	
Ends up as this.
		
	
Will be glad to share any info about how I do it.
	
		
			
		
		
	
				
			Hi Phil.
That 42 minute total build time included applying the printed label, drilling the case, testing and buttoning up.
It was for the basic 3 channel version.
Packaging and printing instructions took another couple of minutes each.
I do three 5 channel versions they each took an extra 4 minutes per channel to build and install. Each channel could be soldering the servo leads to pot legs or building and applying smd parts and two push buttons per channel, to a small pcb.
I don't do Selecta, so that makes life a lot easier.
	
	Plus
	Mounted in the case
	Ends up as this.
	Will be glad to share any info about how I do it.
			
				Last edited: