Thought it was about time for an update on what's been occuring on the EM&BHR:thumbup:

I've a few days off to look after Mary, she's recovering well:thumbup: I've had a bit of time this afternoon to get out in the garden and start some track work that we want to do.

Here's a diagram of how we want to chage the layout
5486bbd026eb42e4883735c0e18cb0bd.jpg

This is how the junction at Blackberry Hill Tunnel looked before the change
848e26ce73414d1eb0698dac258c9615.jpg

And after the change:thumbup:
cbd3135a4eb949aebb0d35cf93091148.jpg

Junctin near Rose Garden before the change
bd6783d3daf84998b10dc63153fe6640.jpg

And after:thumbup:
7b7f518d7ad34396a6b0f6cdba309fcc.jpg
 
that is possably the best photo yet steve
 
Do I see double tracking?

Great....
 
Didn't get as much time as I thought I might over the weekend, but did manage to get a little done. Made a start on laying some track:thumbup:

Nice curves:thumbup:
d1fb241be19a4ce89a9d9de54fd2a4d2.jpg


Straight away:thumbup:
f0ce70a733b541e7a4f3d0781c7ab4d3.jpg


Where the curve is planned to re-attach onto the straight by the station:thumbup:
7c621f725be94d2998fd21d0d4b39067.jpg
 
Managed to lay the first part of the double track:thumbup:

The long straight:thumbup:
af0c35fd635949d197d88b042871907c.jpg


And the curve at the end of the straight leading into the station area:thumbup:
22dbcd9a4b1e440c9e6b0486e1f5f0b4.jpg


The track to the left needs a set of L/H R3 points to be able to connect to the station. they will replace the L/H R3 curve, and then the track will reconnect beyond the signal box:thumbup: Not got a pic of this at the mo, will get one taken soon.
 
Managed a little more work on the track re-alignmant today. Installed the cross over points at the station, and lined up the curve.

Cross over points
b39514e4f12b445fae39b9ef09d01388.jpg


And the curve
a4992f8b01a0470a8a42570582d53277.jpg
 
Then the path cross over test alignment.

The curve
11ce4f32d9f34ae89ccd0e06c6dad597.jpg


And the points
601b2bf67928451994e9f1e3e36ff6e9.jpg


This was just a trial fitting, the curve was created with a frackbender. Hopefully, final istall will happen over the weekend, weather permitting.
 
Been busy today, after completing the track re-alignment it was time to tackle the crossing. Managed to get most of it done today and get a train to run across as well.

Crossing
a20789361df64f999e1e06449da845b7.jpg


First trains
6b364fe44dd24d4cadbaa3f97804c9f6.jpg
 