Cheers guys. A rather large parcel has arrived too.
My first gauge 3 point courtesy of Cliff Barker.
Compared with a G scale R1.
I now have 8 yards of G3 track, the point and the original 8 feet of GRS track that currently acts as the interchange siding. Got a fair bit of work to do before track laying can commence though.

My first gauge 3 point courtesy of Cliff Barker.
Compared with a G scale R1.

I now have 8 yards of G3 track, the point and the original 8 feet of GRS track that currently acts as the interchange siding. Got a fair bit of work to do before track laying can commence though.
